‹ Demolition & Junk Removal

Dustless Interior Demolition in Seattle

Upper floor taken down to the studs and left broom-clean

Room taken down to the studs and joists, floor protected with Ram Board
Plastic dust barrier sealing the work area from the rest of the home
Ceilings and walls opened up, ductwork and framing exposed
Dormer framing left clean and ready for the next trade
Interior walls stripped back to the framing
Protected walkway through the work area, swept broom-clean
Exterior walls stripped to the brick and sheathing
Upper floor opened to the rafters with existing wiring kept in place

Full interior demolition of an upper floor in a Seattle home. Walls, ceilings, and finishes were removed down to the framing, rafters, and brick using dust-controlled methods, with Ram Board protection on the floors throughout. All debris was hauled away and the space was left broom-clean, ready for the framing, electrical, and finish trades.

  • Dustless Demolition
  • Interior Demolition
  • Broom Clean
  • Debris Haul-Away
  • Seattle